How to install the baseboard

Nov 25, 2019

First, clean the wall

The first thing we have to do is to clean the wall surface and clean up some debris, so that when the lines are installed, the lines can completely close the wall to achieve the best effect, so the lines are also compared. sturdy.


Second, drilling

Then use a special tool to drill holes in the wall. Be sure to observe before drilling, and see if there are any water and electricity lines in the wall to prevent the danger of electric shock. The distance between the drill holes should also be calculated in advance. For example, at the interface between the two lines, the spacing should be smaller, so that the lines can be made stronger.


Third, fixed lines

After drilling the hole, the small wooden strip is nailed into the hole, first look at the specific position of the hole, and then use the nail to fix the line one by one. The fixed-line nails are actually nailed to the wooden strips. Because they are nailed to the wooden strips, they can effectively prevent the nails from loosening. If nailed to the wall, there is a possibility that looseness will occur. The lines are more solid. When nailing the nails, be careful to insert the nails into the holes completely. Do not let them pop out, and keep the lines close to the whole.