How to Install Wood Moulding

Aug 24, 2019

How to Install Wood Moulding?


Drilling: Before drilling, the wiring direction of hydropower should be observed to prevent mistakes. The interval between drilling holes should not be too large, otherwise the kick line will be difficult to stick to the wall. Drilling holes on walls with special tools. The common length of the kick line is 2m. In order to fix the kick line more firmly, the interval between drilling holes should be about 40cm, and the interval between the joints should be smaller. Nail the stick into the hole just punched. The nail that fixes the kick line is nailed on the wooden bar, nailed directly to the wall, and the nail is easy to loosen. Note: Because the pipes of the hydropower project are buried on the wall, the position of the pipes is just below the switch socket. When drilling holes, the position should be calculated to avoid damage. Fixed: Before fixing the kick line, the wall should be leveled and cleaned up, otherwise, after installing the kick line, it can not be completely close to the wall, leaving ugly cracks. Focus on the position of the drill hole and fix the nail on the kick line. When fixing, we should pay attention to whether the kicking line is close to the wall. The nails should also be completely submerged in the kicking line, which can not be seen.